SOLUTION

TOP

Water power

수력

Main Process

  • PAROS System
  • Dam gate (DMG)
  • Intake gate (ING)
  • Tailrace gate(TRG)
  • High voltage/Station service Panel
  • Diesel Generator

Main References

  • 01

    PANGAEA 21, LTD., Upstream integrated management system of dam 1 zone dam in Chungju. Applicable facilities: water power / Glofa

  • 02

    Voith Fuji, Cheongpyeong 4 dam control system Applied equipments: water power / Siemens-PCS7

  • 03

    Voith Fuji, Cheongpyeong 3 Dam & Goesan Applied equipments: water power / Siemens-PCS7

Supply ITEMS
  • HMI
  • PROCESS CONTROL STATION
  • NETWORK SYSTEM
  • GPS SYSTEM