SUWON Environmental Management Facilities |
MPU repair |
2015.12 |
Micrex-AX |
HYUNDAI ROTEM |
Replacement of Gimhae Incinerator HMI |
2015.12 |
Siemens-S7 |
Changwon Environmental Management Facilities |
Purchase of TM / TC for replacement of old facilities in waterworks operation center |
2015.12 |
Micrex-SX |
HYUNDAI ROTEM |
Replacement and commissioning of HMI in Gimhae Waste Incineration Facility |
2015.11 |
Siemens-S7 |
POSCO ICT |
Added Brazil CSP UCC ( Change Pore ) |
2015.11 |
Siemens-S7 |
POSCO |
Power plant UCC DCS system |
2015.11 |
Micrex-AX |
TEASUNG HI TEC |
Ilsan Cogeneration Korea Gas Corporation Heat supply system for natural gas preheating |
2015.10 |
Siemens-S7 |
Changwon Environmental Management Facilities |
Chilser water purification plant water purification equipment ( coagulant ) injection equipment replacement ( electric ) measurement |
2015.10 |
Micrex-AX |
Changwon Environmental Management Facilities |
Process control monitoring system ( HMI ) repair work |
2015.10 |
Micrex-AX |
DCCO |
Distributed control system maintenance construction |
2015.09 |
Micrex-AX |
I TECH |
Chilser water purification plant DCS SYSTEM |
2015.08 |
Micrex-AX |
UNI TECH |
Cochran PJT commissioning S / V dispatch |
2015.08 |
|
POSCO ICT |
Purchase Pohang 2Coke Holder Control panel |
2015.06 |
Micrex-AX |
POSCO ICT |
Purchase of control panel stabilized power system by Pohang Faucet |
2015.05 |
Siemens-S7 |
POSCO ICT |
Brazil CSP UCC System Group separation and S / W addition |
2015.05 |
Siemens-S7 |
KANA ELECTRIC |
SILO and UTILITY PLC H / W |
2015.02 |
|
U-TEK ENG |
Gwangyang SNG Power Demand Forecasting System |
2015.01 |
Siemens-S7 |
BYUCKSAN ENGINEERING |
GS Power Heat Exchanger Heat Exchanger Installation Construction Site |
2015.01 |
Siemens-S7 |
BUGANG INDUSTRY |
Remote control system improvement work Central pressurization and reservoir |
2014.12 |
Micrex-SX |
Changwon Environmental Management Facilities |
Waterworks operation center and water purification plant integrated monitoring system construction construction |
2014.12 |
Micrex-AX |
LS-NIKKO COPPER |
RO ( reverse osmosis ) facility |
2014.11 |
Micrex-AX |
DAEGWANG ENC |
Daejeon CES 4th stage construction work |
2014.10 |
Siemens-S7 |
Dong Bang HI-TECH |
FUJI SX PLC Programming & DCS MMI Data Configuration |
2014.10 |
Micrex-SX |
HAELIM ENGINEERING |
Osan cogeneration SCR control system |
2014.10 |
Siemens-S7 |
GS O&M |
Ulsan Green PLC HW SPARE PART |
2014.10 |
Siemens-S7 |
POSCO ENGNEEING |
Seongsu-dong 1-ga Knowledge Industry Center new construction |
2014.09 |
Siemens-S7 |
POSCO ICT |
Established Pohang NO.1 COG HOLDER |
2014.09 |
Micrex-AX |
DCCO |
Distributed control system maintenance work for environmental energy business |
2014.09 |
Micrex-AX |
ULSAN BYEONG YEONG YONGSACHON |
2 Transmission pump room high-voltage motor moving panel replacement work |
2014.06 |
Siemens-S7 |
HYUNDAI ROTEM |
Kimhae City Waste Incineration Facility Management Office |
2014.04 |
Siemens-S7 |
SEWON TECH |
Jeonbuk Energy ESP PANEL Replacement Construction |
2014.04 |
Siemens-S7 |
POSCO ICT |
Gwangyang coal use SNG power UCC MPU |
2014.03 |
Siemens-S7 |
POWELL |
Renewal of water facility PCS7 |
2014.02 |
Siemens-PCS7 |
POSCO ICT |
Indonesia UCC Modification 1 formula |
2014.02 |
Siemens-S7 |
DONG HWA E&I |
Suwon City Energy Independent Process Improvement Project |
2014.02 |
Micrex-AX |
UYANG MACHINE INDUSTRY |
Hyundai Engineering & Construction Corporation |
2013.12 |
Siemens-S7 |
POSCO ICT |
Added Brazil CSP UCC PC PANEL relay |
2013.12 |
Siemens-S7 |
JEONGTO |
Measurement control equipment in Suwon city sewage treatment facility energy self-sufficiency pilot project |
2013.11 |
Micrex-AX |
ENTOB |
Pohang ) Electric blower MPU replacement |
2013.11 |
Micrex-AX |
POWELL |
Improved PCS7 for MOV installation |
2013.10 |
Micrex-AX |
ULSAN GREEN |
Ulsan Incinerator DLP Control System |
2013.10 |
Siemens-S7 |
DCCO |
Distributed control system maintenance work for environmental energy business |
2013.10 |
Micrex-AX |
KSYS |
Chilser water purification plant water intake monitoring system |
2013.10 |
Micrex-AX |
POSCO ICT |
Pohang ) # 2 Mix Station LNG static pressure control system |
2013.09 |
Micrex-AX |
HALLA ENERGY & ENVIRONMENT |
Distributed control system ( DCS ) replacement works for incinerators 1 and 2 |
2013.08 |
Siemens-S7 |
YOUHO ELECTRIC |
Brazil CSP Steel Works Substation PLC |
2013.07 |
Siemens-S7 |
POSCO ICT |
Pohang ) Finex ucc Frequency Relay |
2013.07 |
Siemens-S7 |
H&T |
Hanwha Construction BNcP PC factory crane installation work |
2013.03 |
Siemens-S7 |
PMC KOREA |
Suwon City Environmental Facilities Energy Independence Phase 1 Pilot Project Measurement Control |
2013.03 |
Micrex-AX |
UONE C&E |
Gyeonggi Green Energy PLC & HMI, measurement control system delivery, installation, commissioning |
2013.01 |
Siemens-S7 |
POSCO ICT |
Establish Brazil CSP UCC |
2012.12 |
Siemens-S7 |
JEONGSAN E&T |
Expansion of wastewater 4 plants |
2012.12 |
Micrex-AX |
UONE C&E |
Wonju Waste Integrated Treatment Plant Measurement and Control System |
2012.10 |
Siemens-S7 |
POSCO ICT |
UCC Rationalized CP CARD Additional purchase |
2012.10 |
Micrex-AX |
EUNSUNG ELECTRIC |
Suwon City Environment Office disinfection control PLC replacement |
2012.10 |
Micrex-AX |
HANJIN ELECTRIC INDUSTRY |
Installation of activated carbon filter paper turbidity meter |
2012.10 |
Micrex-AX |
Changwon Environmental Management Facilities |
PLC for waterworks operating system replacement |
2012.10 |
Micrex-AX |
KOREA POWER EXCHANGE |
Construction of new telecommunication facilities of Seoul Power Station building |
2012.10 |
|
ILJIN ENERGY |
Back-up Boiler Pay Meter System |
2012.09 |
Micrex-AX |
DCCO |
Distributed control system maintenance work for environmental energy business |
2012.09 |
Micrex-AX |
DaeSin E&S |
Gwangyang 4 hot rolling FOR UCC |
2012.08 |
Micrex-AX |
POSCO E&C |
Integrated control room image display, lighting control system and corrective sensor |
2012.08 |
Micrex-AX |
POSCO ICT |
UCC Rationalization ( Hydrogen ) PDP PANEL 1 |
2012.07 |
|
POSCO ICT |
Pohang ) Environmental Center TMS Network Construction |
2012.07 |
Micrex-AX |
POSCO ICT |
Pohang ) UCC Rationalization R I / O Panel 2 addition |
2012.07 |
Micrex-AX |
MND WELFARE AGENCY |
mart of old Environmental Improvement Corporation |
2012.06 |
|
KOLON GLOBAL |
Daejeon CES business 3rd Stage Construction |
2012.05 |
Siemens-S7 |
HYUNDAI ROTEM |
Samsung Engineering cans recycling facilities |
2012.05 |
Siemens-S7 |
POSCO ICT |
Second Revision of UCC Rationalization |
2012.05 |
Micrex-AX |
POSCO ICT |
Pohang UCC rationalization ( power addition project ) |
2012.04 |
Micrex-AX |
HYUNDAI ROTEM |
Jangyu incinerator program remodeling |
2012.04 |
Siemens-S7 |
POSCO ICT |
3 Finex UCC control system |
2012.04 |
Micrex-AX |
HI-TECH ENG |
Construction of petrochemical propane feed plant |
2012.04 |
Siemens-S7 |
POSCO ICT |
UCC Rationalized power, power field retrofit |
2012.03 |
Micrex-AX |
Gangwon B&E |
DCS CONTROL SYSTEM |
2012.02 |
Micrex-AX |
DAEKYUNG ESCO |
Unit 1 incinerator SNCR facility DCS program |
2012.01 |
Micrex-AX |
POSCO ICT |
Installed 1 ~ 5th coke dust collector ( PLC H / W ) |
2011.12 |
Siemens-S7 |
KUGDONG SYSTEM |
Chilser water treatment plant related work / program |
2011.12 |
Micrex-AX |
HANUL JEONSEOL |
Sludge transfer piping connected with 1,2 plant site |
2011.12 |
Micrex-AX |
POSCO ICT |
Pohang UCC OPERATION ROOM improvement |
2011.12 |
Micrex-AX |
Changwon Environmental Management Facilities |
Purchase maintenance parts for waterworks operation center monitoring and control system |
2011.12 |
Micrex-AX |
POSCO ICT |
Gwangyang Blast Furnace Boosting UCC |
2011.12 |
Micrex-AX |
PANGAEA21 |
Establishment of total employee system at Yeongwol-gun processing center |
2011.12 |
Glofa |
POSCO ICT |
Compensation of old facilities of CBL ( PLC Panel ) |
2011.11 |
Siemens-S7 |
POSCO ICT |
Indonesia UCC PJT added |
2011.10 |
Siemens-S7 |
POSCO ICT |
Gwangyang TRP measurement DCS1 type supply |
2011.10 |
Micrex-AX |
POSCO ICT |
Supply of 1 UCC DCS in Indonesia |
2011.10 |
Siemens-S7 |
I TECH |
LICC power hydrogen CPL H / W |
2011.10 |
Micrex-AX |
LSIS |
ENVIRONMENTAL ENERGY ENTERPRISE # 1 Manned Blower High Voltage Inverter Program |
2011.10 |
Micrex-AX |
HANUL JEONSEOL |
1.2 Establishment of sludge transfer pipe connected to the treatment plant |
2011.08 |
Micrex-AX |
Kyeryong Electric |
Modified 12SETS PROGRAM for High Efficiency Inverter for environmental energy business |
2011.08 |
Micrex-AX |
DCCO |
Purchase and installation of distributed control system for environmental energy business |
2011.07 |
Micrex-AX |
DEAWOO ENG |
DAEJEON CES business Phase 1 Construction / PLC SYSTEM |
2011.06 |
Siemens-S7 |
MyeongSeong ENG |
Chungju dam village sewage PUMP section Manhole 01, 02 |
2011.06 |
Glofa |
I TECH |
UCC SYSTEM_Power |
2011.05 |
Micrex-AX |
POSCO E&C |
Gwangyang ) Plate Heat treatment E / C UCC signal subscription and commissioning |
2011.05 |
Micrex-AX |
POSCO ICT |
UCC remodeling due to the expansion of port electric rooms |
2011.05 |
Micrex-AX |
POSCO ICT |
ICT / Pohang UCC rationalization ( power plant ) |
2011.05 |
Micrex-AX |
HYUNDAI ROTEM |
Oxygen Plant Supplementary Purchasing Corporation |
2011.04 |
Siemens-S7 |
POSCO ICT |
DATA BANKING FOR UCC |
2011.03 |
Micrex-AX |
SUWON Environmental Facilities |
Purchase DCS operating system PC |
2011.03 |
Micrex-AX |
POSCO ICT |
New reactive power compensator (UCC modified) |
2011.02 |
Micrex-AX |
NAM SUNG ENGINEERING |
Mapo resource recovery |
2011.01 |
Micrex-AX |
Phil Power |
Road lighting control system |
2011.01 |
|