SOLUTION

TOP

Delivery performance

2016 ~ Now
년도별 납품실적의 대한 정보를 제공
Mapo resource recovery facility Create DCS Data Report 2018.01 Micrex-View
SNNC Bag Filter LCP Outsourcing Repair 2018.01 Siemens-PCS7
TAESHIN SYSTEM Pohang ) 4 Sintered product BAG FILTER newly established 2018.01 Siemens-S7
POSCO ICT Pohang ) UCC load interception system ( SSC ) Old age replacement 2017.12 Siemens-PCS7
POSCO ICT GAS COG BOOSTER was newly established 2017.12 Micrex-AX
DOO YOUNG 2 Steel Pure Chemical Facilities ( Dosing System Remodeling ) 2017.12 Micrex-SX
DCCO Distributed control system ( DCS ) repair work 2017.11 Micrex-AX
DEASUN E&C Shin Boryeong Fishery Seedling Cultivation Facility Instrumentation Construction 2017.11 Siemens-PCS7
DCCO Distributed control system maintenance construction 2017.09 Micrex-AX
Okcheon-gun Environmental Management Facilities Repair work at Chungsan water purification plant PLC and communication line 2017.08 Glofa
Changwon Environmental Management Facilities Valve automation construction work for Chilser water purification plant activated carbon filter paper 2017.08 Micrex-AX
POSCO ICT Smart Data Center UCC Modification 1SET 2017.07 Micrex-AX
HANMI ENTEC Gwangyang ) 3Utility CO2 supply equipment for alkaline wastewater neutralization 2017.07 Siemens-S7
DOO YOUNG 2 Steelmaking Pure Pure Chemical Facilities 2017.06 Micrex-SX
Anyang Environmental Management Facilities Foil water purification plant automatic control equipment repair work 2017.06 Glofa
POSCO ICT 1 Hot-rolled ECS facility UCC remodeling 2017.06 Micrex-AX
KORED Improvement of pure water manufacturing facility of Mapo resource recovery facility 2017.05 Micrex-View
DOO YOUNG Power generation pure water treatment facility extension DCS 2017.04 Micrex-View
Changwon Environmental Management Facilities Purchase monitoring system for water quality research center 2017.04 Micrex-AX
POSCO Pohang ) 1GAS Station Central power generation wastewater neutralization equipment PLC interchange 2017.02 Micrex-AX
POSCO ICT Brazil CSP UCC GAS Holder commissioning and FC admission services 2017.02 Siemens-S7
BOOYOUNG ENGINEERING GMP Sang-am no-eul Supervisory control system 2017.02 Siemens-S7
POSCO ICT Pohang 2COG Holder new EIC S / V 1SET 2016.12 Micrex-AX
POSCO ICT Pohang 2COG Holder New EIC Modification 1SET 2016.12 Micrex-AX
POSCO ICT Installation of Pohang Energy Operation Management Gateway 2016.12 Micrex-AX
Gwangam Arisu Water Purification Center Purchase and installation of automatic control system 2016.12 Glofa
POSCO ICT Pohang POSMC DCS UCC Modification 2016.12 Siemens-S7
POSCO ICT Pohang 3 Finex DCS UCC Modification 2016.12 Siemens-S7
TAEYOUNG TELECOM Changwon remote monitoring and control panel installation ( 5 places ) PLC program design and commissioning 2016.11 Micrex-AX
WINTEC Wonju Environment Office 2nd stage PLC & HMI modification 2016.11 Siemens-S7
Chosun Industrial Bulgog Pressure field PLC Program HMI design and commissioning 2016.11 Micrex-SX
POSCO ICT KR Sludge UCC remodeling and instrumentation purchasing 1SET 2016.11 Micrex-AX
KOLON KESCO Manufacture and delivery of PCS control panel for surveillance and control facilities during the installation of steam supply facilities in Ulsan 2016.11 Glofa
WELCRON HANTEC HOC Project EPC electrical and instrumentation construction 2016.11 Siemens-S7
POSCO ICT Purchase Pohang 154kv UCC Control System 2016.10 Siemens-S7
Kyungnam Communication Technology Changwon Hyundong nursery housing complex pumping station installation work 2016.10 Micrex-SX
DCCO Distributed control system maintenance construction 2016.09 Micrex-AX
POSCO ICT PLC Modules and remodeling for Gwangyang seawater fresh water supply 2016.08 Micrex-AX
POSCO ICT Purchased UCC control system for Gwangyang seawater fresh water supply 2016.08 Micrex-AX
POSCO Pohang ) Power generation water treatment room DCS old replacement 2016.06 Micrex-View
SHIN YOUNG E&I Improved Mapo burner incinerator operation room 2016.05 Micrex-View
POSCO ICT Purchase Pohang 2BFG Holder Control System 2016.05 Siemens-S7
SHINIL ELECTRIC Production of power surveillance unit in Ulsan steam supply facility 2016.04 Glofa
SUNTECH ENG Purchase and installation of distributed control system in Mapo resource recovery facility 2016.04 Micrex-View
HYUNDAI ENGINEERING Ulsan steam supply facility installation business 2016.03 Glofa
KOLON GLOBAL Myungji district collective energy business heat source facility construction / DCS 2016.01 Siemens-PCS7
썬텍엔지니어링 마포자원회수시설 분산제어시스템 구매 및 설치 2016.04 Micrex-View
현대엔지니어링 울산증기공급시설 설치사업 2016.03 Glofa
코오롱글로벌 명지지구 집단에너지사업 열원설비 건설공사/DCS 2016.01 Siemens-PCS7
2011 ~ 2015
년도별 납품실적의 대한 정보를 제공
SUWON Environmental Management Facilities MPU repair 2015.12 Micrex-AX
HYUNDAI ROTEM Replacement of Gimhae Incinerator HMI 2015.12 Siemens-S7
Changwon Environmental Management Facilities Purchase of TM / TC for replacement of old facilities in waterworks operation center 2015.12 Micrex-SX
HYUNDAI ROTEM Replacement and commissioning of HMI in Gimhae Waste Incineration Facility 2015.11 Siemens-S7
POSCO ICT Added Brazil CSP UCC ( Change Pore ) 2015.11 Siemens-S7
POSCO Power plant UCC DCS system 2015.11 Micrex-AX
TEASUNG HI TEC Ilsan Cogeneration Korea Gas Corporation Heat supply system for natural gas preheating 2015.10 Siemens-S7
Changwon Environmental Management Facilities Chilser water purification plant water purification equipment ( coagulant ) injection equipment replacement ( electric ) measurement 2015.10 Micrex-AX
Changwon Environmental Management Facilities Process control monitoring system ( HMI ) repair work 2015.10 Micrex-AX
DCCO Distributed control system maintenance construction 2015.09 Micrex-AX
I TECH Chilser water purification plant DCS SYSTEM 2015.08 Micrex-AX
UNI TECH Cochran PJT commissioning S / V dispatch 2015.08
POSCO ICT Purchase Pohang 2Coke Holder Control panel 2015.06 Micrex-AX
POSCO ICT Purchase of control panel stabilized power system by Pohang Faucet 2015.05 Siemens-S7
POSCO ICT Brazil CSP UCC System Group separation and S / W addition 2015.05 Siemens-S7
KANA ELECTRIC SILO and UTILITY PLC H / W 2015.02
U-TEK ENG Gwangyang SNG Power Demand Forecasting System 2015.01 Siemens-S7
BYUCKSAN ENGINEERING GS Power Heat Exchanger Heat Exchanger Installation Construction Site 2015.01 Siemens-S7
BUGANG INDUSTRY Remote control system improvement work Central pressurization and reservoir 2014.12 Micrex-SX
Changwon Environmental Management Facilities Waterworks operation center and water purification plant integrated monitoring system construction construction 2014.12 Micrex-AX
LS-NIKKO COPPER RO ( reverse osmosis ) facility 2014.11 Micrex-AX
DAEGWANG ENC Daejeon CES 4th stage construction work 2014.10 Siemens-S7
Dong Bang HI-TECH FUJI SX PLC Programming & DCS MMI Data Configuration 2014.10 Micrex-SX
HAELIM ENGINEERING Osan cogeneration SCR control system 2014.10 Siemens-S7
GS O&M Ulsan Green PLC HW SPARE PART 2014.10 Siemens-S7
POSCO ENGNEEING Seongsu-dong 1-ga Knowledge Industry Center new construction 2014.09 Siemens-S7
POSCO ICT Established Pohang NO.1 COG HOLDER 2014.09 Micrex-AX
DCCO Distributed control system maintenance work for environmental energy business 2014.09 Micrex-AX
ULSAN BYEONG YEONG YONGSACHON 2 Transmission pump room high-voltage motor moving panel replacement work 2014.06 Siemens-S7
HYUNDAI ROTEM Kimhae City Waste Incineration Facility Management Office 2014.04 Siemens-S7
SEWON TECH Jeonbuk Energy ESP PANEL Replacement Construction 2014.04 Siemens-S7
POSCO ICT Gwangyang coal use SNG power UCC MPU 2014.03 Siemens-S7
POWELL Renewal of water facility PCS7 2014.02 Siemens-PCS7
POSCO ICT Indonesia UCC Modification 1 formula 2014.02 Siemens-S7
DONG HWA E&I Suwon City Energy Independent Process Improvement Project 2014.02 Micrex-AX
UYANG MACHINE INDUSTRY Hyundai Engineering & Construction Corporation 2013.12 Siemens-S7
POSCO ICT Added Brazil CSP UCC PC PANEL relay 2013.12 Siemens-S7
JEONGTO Measurement control equipment in Suwon city sewage treatment facility energy self-sufficiency pilot project 2013.11 Micrex-AX
ENTOB Pohang ) Electric blower MPU replacement 2013.11 Micrex-AX
POWELL Improved PCS7 for MOV installation 2013.10 Micrex-AX
ULSAN GREEN Ulsan Incinerator DLP Control System 2013.10 Siemens-S7
DCCO Distributed control system maintenance work for environmental energy business 2013.10 Micrex-AX
KSYS Chilser water purification plant water intake monitoring system 2013.10 Micrex-AX
POSCO ICT Pohang ) # 2 Mix Station LNG static pressure control system 2013.09 Micrex-AX
HALLA ENERGY & ENVIRONMENT Distributed control system ( DCS ) replacement works for incinerators 1 and 2 2013.08 Siemens-S7
YOUHO ELECTRIC Brazil CSP Steel Works Substation PLC 2013.07 Siemens-S7
POSCO ICT Pohang ) Finex ucc Frequency Relay 2013.07 Siemens-S7
H&T Hanwha Construction BNcP PC factory crane installation work 2013.03 Siemens-S7
PMC KOREA Suwon City Environmental Facilities Energy Independence Phase 1 Pilot Project Measurement Control 2013.03 Micrex-AX
UONE C&E Gyeonggi Green Energy PLC & HMI, measurement control system delivery, installation, commissioning 2013.01 Siemens-S7
POSCO ICT Establish Brazil CSP UCC 2012.12 Siemens-S7
JEONGSAN E&T Expansion of wastewater 4 plants 2012.12 Micrex-AX
UONE C&E Wonju Waste Integrated Treatment Plant Measurement and Control System 2012.10 Siemens-S7
POSCO ICT UCC Rationalized CP CARD Additional purchase 2012.10 Micrex-AX
EUNSUNG ELECTRIC Suwon City Environment Office disinfection control PLC replacement 2012.10 Micrex-AX
HANJIN ELECTRIC INDUSTRY Installation of activated carbon filter paper turbidity meter 2012.10 Micrex-AX
Changwon Environmental Management Facilities PLC for waterworks operating system replacement 2012.10 Micrex-AX
KOREA POWER EXCHANGE Construction of new telecommunication facilities of Seoul Power Station building 2012.10
ILJIN ENERGY Back-up Boiler Pay Meter System 2012.09 Micrex-AX
DCCO Distributed control system maintenance work for environmental energy business 2012.09 Micrex-AX
DaeSin E&S Gwangyang 4 hot rolling FOR UCC 2012.08 Micrex-AX
POSCO E&C Integrated control room image display, lighting control system and corrective sensor 2012.08 Micrex-AX
POSCO ICT UCC Rationalization ( Hydrogen ) PDP PANEL 1 2012.07
POSCO ICT Pohang ) Environmental Center TMS Network Construction 2012.07 Micrex-AX
POSCO ICT Pohang ) UCC Rationalization R I / O Panel 2 addition 2012.07 Micrex-AX
MND WELFARE AGENCY mart of old Environmental Improvement Corporation 2012.06
KOLON GLOBAL Daejeon CES business 3rd Stage Construction 2012.05 Siemens-S7
HYUNDAI ROTEM Samsung Engineering cans recycling facilities 2012.05 Siemens-S7
POSCO ICT Second Revision of UCC Rationalization 2012.05 Micrex-AX
POSCO ICT Pohang UCC rationalization ( power addition project ) 2012.04 Micrex-AX
HYUNDAI ROTEM Jangyu incinerator program remodeling 2012.04 Siemens-S7
POSCO ICT 3 Finex UCC control system 2012.04 Micrex-AX
HI-TECH ENG Construction of petrochemical propane feed plant 2012.04 Siemens-S7
POSCO ICT UCC Rationalized power, power field retrofit 2012.03 Micrex-AX
Gangwon B&E DCS CONTROL SYSTEM 2012.02 Micrex-AX
DAEKYUNG ESCO Unit 1 incinerator SNCR facility DCS program 2012.01 Micrex-AX
POSCO ICT Installed 1 ~ 5th coke dust collector ( PLC H / W ) 2011.12 Siemens-S7
KUGDONG SYSTEM Chilser water treatment plant related work / program 2011.12 Micrex-AX
HANUL JEONSEOL Sludge transfer piping connected with 1,2 plant site 2011.12 Micrex-AX
POSCO ICT Pohang UCC OPERATION ROOM improvement 2011.12 Micrex-AX
Changwon Environmental Management Facilities Purchase maintenance parts for waterworks operation center monitoring and control system 2011.12 Micrex-AX
POSCO ICT Gwangyang Blast Furnace Boosting UCC 2011.12 Micrex-AX
PANGAEA21 Establishment of total employee system at Yeongwol-gun processing center 2011.12 Glofa
POSCO ICT Compensation of old facilities of CBL ( PLC Panel ) 2011.11 Siemens-S7
POSCO ICT Indonesia UCC PJT added 2011.10 Siemens-S7
POSCO ICT Gwangyang TRP measurement DCS1 type supply 2011.10 Micrex-AX
POSCO ICT Supply of 1 UCC DCS in Indonesia 2011.10 Siemens-S7
I TECH LICC power hydrogen CPL H / W 2011.10 Micrex-AX
LSIS ENVIRONMENTAL ENERGY ENTERPRISE # 1 Manned Blower High Voltage Inverter Program 2011.10 Micrex-AX
HANUL JEONSEOL 1.2 Establishment of sludge transfer pipe connected to the treatment plant 2011.08 Micrex-AX
Kyeryong Electric Modified 12SETS PROGRAM for High Efficiency Inverter for environmental energy business 2011.08 Micrex-AX
DCCO Purchase and installation of distributed control system for environmental energy business 2011.07 Micrex-AX
DEAWOO ENG DAEJEON CES business Phase 1 Construction / PLC SYSTEM 2011.06 Siemens-S7
MyeongSeong ENG Chungju dam village sewage PUMP section Manhole 01, 02 2011.06 Glofa
I TECH UCC SYSTEM_Power 2011.05 Micrex-AX
POSCO E&C Gwangyang ) Plate Heat treatment E / C UCC signal subscription and commissioning 2011.05 Micrex-AX
POSCO ICT UCC remodeling due to the expansion of port electric rooms 2011.05 Micrex-AX
POSCO ICT ICT / Pohang UCC rationalization ( power plant ) 2011.05 Micrex-AX
HYUNDAI ROTEM Oxygen Plant Supplementary Purchasing Corporation 2011.04 Siemens-S7
POSCO ICT DATA BANKING FOR UCC 2011.03 Micrex-AX
SUWON Environmental Facilities Purchase DCS operating system PC 2011.03 Micrex-AX
POSCO ICT New reactive power compensator (UCC modified) 2011.02 Micrex-AX
NAM SUNG ENGINEERING Mapo resource recovery 2011.01 Micrex-AX
Phil Power Road lighting control system 2011.01
2006 ~ 2010
년도별 납품실적의 대한 정보를 제공
MyeongSeong ENG complete set for SCADA 2010.12
METAWATER Addition of Yenso pumping 2010.11 Micrex-SX
PANGAEA21 Ulsan sewage water terminal 2010.10
LSIS DAEJEON incinerator inverter control 2010.10 Micrex-AX
DCCO DCS maintenance and inspection of environmental energy business establishment 2010.09 Micrex-AX
BST SUWON Environmental Facilities_SLUDGE 2010.08 Micrex-AX
SUWON Environmental Facilities Sec, Scrubber collector distributed control system improvement program construction 2010.07 Micrex-AX
Anyang Environmental Management Facilities Improved operation of gwan-yang reservoir inlet valve operation security 2010.06 Micrex-F
MINSUNG DCS control system 2010.06 Micrex-AX
SUWON Environmental Facilities Remodeling of a polymeric pump 2010.05 Micrex-AX
HANKUK ELECTRIC ENG Construction of unmanned automated facility for water supply facility 2010.05 Micrex-AX
Gangwon B&E 15 ton boiler control system 2010.05 Siemens-S7
MASAN Environmental Management Facilities Dose of medicine CONTROL PROGRAM Improvement work 2010.04 Micrex-AX
POSCO ICT 3 types including DCS System 1set 2010.04 Micrex-AX
LSIS Co., Ltd Seohocheon linkage processing ACS-2000 2010.04 Micrex-AX
POSCO ICT New steelmaker LDG Holder UCC ( DCS ) 2010.03 Siemens-S7
KGCSOFT Improving DCS of operation room of BISAN water treatment plant 2010.03 Micrex-AX
MyeongSeong ENG Add Chungju Manhole Pump Material 2010.02 Glofa
POSCO ICT Gwangyang 9MB Instrument Panel 2010.01 Micrex-AX
MyeongSeong ENG Chungju Manhole Pump Material 2010.01 Glofa
METAWATER Yen So Pumping station 2009.07 Micrex-SX
POSCO ICT Replacement of UCC in ironstone facility 2009.05 Micrex-AX
NP Sintered clean UCC equipment 2009.02 Micrex-AX
NP 3,4 Sintering FGCS BU FAM DCS 2009.02 Micrex-AX
NP Add new steel UCC H/W 2009.02 Siemens-S7
POSCO E&C Gwangyang ) Triple end DCS Modification 2009.01 Micrex-AX
METAWATER DAEJEON SLUDGE AUTOMATIC CONTROL PANEL 2008.11 Micrex-SX
POSCO ICT Gwangyang ) UCC water heater 2008.09 Micrex-AX
POSCO E&C Gwangyang ) 4 Blast Furnace 1st Order Auto System 2008.07 Micrex-AX
MASAN Environmental Management Facilities Masan / Chilser distributed control system improvement construction 2008.05 Micrex-AX
POSCO ICT Gwangyang heavy plate water distribution system UCC DCS SYSTEM 2008.05 Micrex-AX
GLOBAL ENVIRONMENT TECH / POHANG Pohang 2 Steel-making converter dust collector cooling plant PLC 2008.04 Micrex-IX
POSCO ICT POSCO NO.2 EGL Renovation of UCC facilities 2008.04 Micrex-AX
DONGYANG ELECTRIC / POHANG 3 Sintering Dust Collector AIR MPRESSOR Replacement
2008.03 Micrex-AX
JS Industry Sludge Storage UCC Remodeling 2008.03 Micrex-AX
BUMIN Industry / ULSAN Accumulator DCS Program 2008.01 Micrex-AX
Changwon City Chilseo Purification Plant / Revamping Filter Bed 2006-12 Micrex-IX
Seoul City Amsa Waterworks Water Purification Plant / Maintenance 2006-02 PLC, Panel
2003 ~ 2005
년도별 납품실적의 대한 정보를 제공
Changwon City Chilseo Purification Plant / Supply of DCS Materials 2005.06 Micrex-IX
POSCO Gwangyang / Water Distributing Reservoir #3 2005.04 Micrex-AX
POSCO Pohang / HRM #2 / Water Treatment 2005.03 PLC, Panel
Seoul City Amsa Waterworks Water Purification Plant / Maintenance (05') 2005.02 Micrex-IX
POSCO Pohang / SMP #2 OG / Relocating and Installing Water Treatment 2003.12 Micrex-IX